University of Minnesota Duluth
 
 
myUMD | Search | People | Departments | Events | News
PROJECT MANAGEMENT
Ianni Hall - Griggs Hall G
New Space:

74,396 gross square feet

will connect to Griggs E & F Buildings

Estimated Project Cost:

$14,000,000

Construction Start Date:

June 2010

Completion Date:

Fall 2011

Design Architect:
  • Elness Swenson Graham Architects
  • 500 Washington Ave South
  • Minneapolis, MN 55415
  • (612) 339-5508
  • (612) 39-5382 (fax)
Structural Design:
  • 7 Story Building
  • 280 Beds in traditional 2 student rooms
  • Utility Infrastructure
  • Auxiliary Spaces include:
    • Laundry
    • Study Areas
    • Resident Storage
    • Student Mail Distribution Center
General Contractor:
  • Johnson Wilson Constructors
  • 44331 W Michigan Street
  • Duluth, MN 55816
  • (218) 628-0202
  • (218) 628-0205(fax)
Griggs Hall G approaching from the Southnew entry for Griggs Hallschematic of site layout including Griggs Hall E and FGriggs G first floor planFirst floor plan with red linking dividing existing and new constructionGriggs G second floor plan.Second floor plan with red linking dividing existing and new constructionupper floors schematic design floor plan of the basement of Griggs Hall G

Location Map


University of Minnesota Duluth    Facilities Management       Address: Darland   241     1049 University Drive,   Duluth, MN   55812-3011         Phone: 218-726-8262
© 2014 University of Minnesota Duluth
The University of Minnesota is an equal opportunity educator and employer.
Last modified on 09/25/12 02:28 PM
University of Minnesota Campuses
Crookston | Duluth | Morris
Rochester | Twin Cities | Other Locations