The Economic Impact
of Constructing and Operating
An Integrated Gasification Combined-Cycle Power-
Generation Facility on the Iron Range
UPDATE
2006: Mesaba One Impacts
Including Appendix A: Mesaba Two Impacts, Excelsior Energy
REPORT(
pdf)
Executive
Summary (pdf)

