banner

home
schedule
works
syllabus
resources
email craig
discussion

Announcement: May 9

Please turn in final commentaries to my office in Humanities 425 (inside the Humanities 420 suite), rather than our usual classroom in far-flung Swenson.  I will leave the Composition-department office door open so you can get in, even though the office is officially closed after 4:30. 

If you're in doubt about the location of the Humanities building, see <http://www.d.umn.edu/maps/H/>. 

All the same deadlines apply.  If you wish, you can turn in commentaries to my mailbox, which is to your right as you come into the Humanities 420 door. 

Humanities 420 is two floors above the Tweed Museum, if that helps.  Take the stairs opposite the Tweed's front windows and the Composition office is right in front of you when you get to the 4th floor. 

Class Blackboard for May 2

 

Last Night of Class!

Roll

The Client Project (final) will be due by Tuesday, May 9 at 6 p.m. I will be in the classroom between 6:00 and 6:30 to collect your commentaries, or you can drop your commentary by my mailbox in Humanities 420 before 4:00 p.m. on that day (the office door may or may not be open after that time).

I will assume that the final version of the client project is located at the same URL as your BETA version. Please e-mail me if you have moved it.

I will be in the classroom between noon and 12:30 to collect your commentaries, or you can drop your commentary by my mailbox in Humanities 420 before 4:00 p.m. on that day (the office door may or may not be open after that time). Remeber that no printout of the site itself is required.

The Revision Project will also be due by Tuesday, May 9 at 6 p.m. Be sure to post the revision in a folder called "revision" (leave the original version as it was in its original folder), and send the URL to the Webx discussion "revisions."

A commentary will also be due by that same day and time. No printout of the site itself is required.

Course Evaluations

COMP 5230, section 2, #047229, "Quarter" 5.

 

Workshop

I will link the names in the schedule to the projects themselves, but in the meantime you can visit the projects from the Webx discussion, "client". The "client context" discussion also includes some useful background on each project.

Tuesday, April 25 Tuesday, May 2

1. Justin M.
2. Mark
3. Matthew
4. Keith
5. Michael R.
6. Michael S.
7. Michael Mi
8. Rob
9. Ryan
10. Shannon
11. Steven

12. Tim
13. Andrew
14. Brad
15. Brent
16. Brian
17. Cal
18. Chris
19. Jamie
20. Jennifer
21. Jodi
22. Justin P.

Within 24 hours after the workshop

  1. copy and paste all the written comments you've made for everyone actually discussed (not just scheduled for) that day into the form "Workshop Comments for Today" and click "Send to Craig." Be sure to label each set of comments with the project number, the name of the project's author, and the correct date of the workshop.
  2. Individually send each author your comments on his or her project by using the e-mail list on the form "Workshop Comments for Today.

Resources for Workshop

 

<previous blackboard items>